Since 2018 when PennDOT announced the roundabout project, it faced pushback from Pleasant Valley School District and people in the surrounding community. “The project just has to be done by the completion date on the contract,” Young said. It is up to the trucking company when they start after receiving the notice to proceed. can begin anytime after they receive the notice to proceed. the notice to proceed so the contractor can start work. Once everything is in place, PennDOT will give Latona Trucking Inc. If the requirements are met, PennDOT will hold a preconstruction meeting with the contractor to go over things. can meet all the requirements of the contract. He said in the next 30 to 60 days PennDOT contract review team will take a look at the contract and make sure the bidder, Latona Trucking Inc. “An apparent low bidder came in at little over $18.4 million,” said Ron Young, district press officer for PennDOT District 5. The roundabout is a two-lane roundabout, which means that two lanes of traffic run around the circle, not one lane. A realignment is needed, along with a possible traffic signal. The largest of these is at the intersection with Pilgrim Way. There are also four campus intersection improvements. The road project will include the widening of both Route 209 and Route 115 from two to four lanes around the school campus. Two roundabouts are slated, one at the Route 209 and 115 intersection, the other at the entrance to Pleasant Valley High School at Pleasant Valley Way. Last week, PennDOT opened bids for the construction of the intersection of routes 209 and 115 in Brodheadsville. The Pennsylvania Department of Transportation is moving forward with the Pleasant Valley roundabout project in Chestnuthill Township.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |